Maintenance of Concrete Mixing Plant Host
Cement mixing host is the core of the cement mixing plant, so the maintenance of the mixing host should also be very focused. Let’s take a look at the specific maintenance of the mixing console.
Stir the cleaning and cleaning of the host. The mixing unit should be cleaned at least once during one duty cycle. After the end of the daily production, the mixing of the host should be a comprehensive cleaning method is: in the cleaning process, the water and a little stone into the mixing console stirring 5 ~ 10 min, after cleaning the machine will be all the material removed, Water, material; stop and then flush the pipe, remove the mixing tank inside and outside the dust and adhesion of concrete. Under normal circumstances, JS1000 mixing host water about 150 ~ 180 kg or so, other models can be added or subtracted accordingly, but also self-contained high-pressure water gun to clean up.
In the washing and stirring the host material door, should avoid the upper part of the accumulation of foreign matter under the material stuck material phenomenon. During the mixing process, if the concrete truck is not in place for a long time (more than 20 to 30 min, especially in the summer), the mixer should be cleaned with water.
Normal production period, to regularly check the mixing cylinder and stirring the concrete on the solidification of the situation, if condensation should be promptly required to manually eradicate. Manual cleaning stirrer, you must cut off the power supply, gas, put the remaining gas, lock the control room; manual cleaning mixer, is strictly prohibited violent knock on the stirring shaft, stirring arm and stirring blades.
Daily work, we have to carry out routine maintenance, regular inspection, to ensure the efficiency of cement mixing plant.