HZS35 Engineering Concrete Plant Process is Introduced
HZS35 engineering concrete plant mixing and upgrading of the host JS750 twin-shaft compulsory concrete mixer, aggregate part of the ingredients used PLD1200 concrete batching machine, loader loading, weighing electronic scales.
1. Cement storage by the cement warehouse, conveyor screw conveyor, cement scale measurement;
2. Water from the tank and reservoir storage, pump water supply, water scale measurement;
3. Liquid admixture in the additive storage tank Stir the corrosion pump into the admixture scale for measurement.
4. Cement, fly ash through the screw conveyor into the measuring hopper cement, when the delivery volume and set the same value, the computer sends a signal to stop the delivery, control the bottom of the cement weighing bucket pneumatic butterfly valve so that the material inside the cement bucket Mixer.
5. The entire ingredients and mixing process by the electronic control system to complete the automatic control (also can be manually controlled), all the material into the JS750 double horizontal shaft compulsory concrete mixer, began mixing time. Mixing time to open the discharge door unloading, that is, to complete a mixing process.